mandag 23. juni 2025

Spyder RT SE5 check up on the lift.

The lift is in position.

Footpeg secured so it don not tip over.

Rear liftingpoint in position

Front lifting point positioned.

22mm socket ready.

After the use of a powerdrill it is ready for inspection.

 

Ingen kommentarer:

Legg inn en kommentar